The Lowcountry Sub-Surface Civil Engineering & Pipe Rehabilitation Authority
Palmetto Pipe Lining delivers high-performance mechanical plumbing, commercial sewer main management, and trenchless structural craftsmanship engineered for the specific water properties, structural layouts, and regulatory codes of the South Atlantic landscape.
- Corporate Operational Headquarters: 4509 Savannah Highway, Suite 104, Ravenel, SC 29470 | (843) 905-3367
- Precision-Focused Trenchless Operations Protecting the Southern Region’s Oldest Infrastructure.
Advanced Technology & Field Disclaimers
- NuFlow UV & Pull-In-Place CIPP Systems: Cured-in-place pipe lining (CIPP) involves utilizing remote electronic ultraviolet or structural ambient epoxies to trigger rapid chemical polymerization inside an existing pipe loop, creating a root-proof, structural pipe within the host line. Successful installation requires precise tracking of alignment vectors, fluid pressure values, and electronic lighting metrics.
- Picote Spin Coating & Structural Lining: Our advanced Picote Spin Coating systems inject durable epoxy-based structural barriers within small-diameter cast iron pipelines down to 2 inches in diameter. This restores aged infrastructure without disrupting irreplaceable historic finishes or decorative structural millwork. Internal paths must be thoroughly descaled and verified dried prior to epoxy chemical placement to achieve molecular bonding.
- High-Definition CCTV Camera Inspections & Locating: Visual high-resolution closed-circuit television (CCTV) evaluations and electromagnetic line-locating sequences deliver an immediate snapshot of the internal condition of your drains. These diagnostics verify current connections, structural splits, or root entry points with precision, but do not protect against future foreign material blockages subsequently introduced by structural usage errors.
- South Carolina 811 Groundbreaking Law Compliance: In accordance with the South Carolina Underground Facility Damage Prevention Act, no heavy sub-surface mechanical drilling, entry pit excavation, or mechanical groundbreaking will commence until the state tracking network (South Carolina 811 / Palmetto Utility Protection Service) has fully verified and marked all public underground main utilities. Mapping and isolating private utility lines remains the absolute operational liability of the primary infrastructure asset owner.